PROJECTS AND INTERNATIONAL EXPERIENCE

MINING, AUTHORISATION/PERMIT PROCEDURE - PROCESS, CEMENT PRODUCTION

 

2022

MARKOLIN GmbH - Diabas - Open Pit Mine, BRUECKL, AUSTRIA
Preparation of official mineplan 2022-2026.

AUSTRIAN RESEARCH FUNDING INSTITUTE (FFG)

Research about Reduction of process related kiln-stoppage by forward-looking data evaluation.

 

2021

PMT - Powder Making Technologies; GLEISDORF, AUSTRIA

Preparing a best practice for ballmill cooling by water injection.

DEUTSCHE BARYT INDUSTRIE, BAD LAUTERBERG, BRD
Audit of a fine-grinding Plant (k80 < 7µm). Focus: new product line; Preparation of todo's inkluding an investment estimate to improve the operation.

MODRE BERGBAU GmbH, BERGSTEIN, AUSTRIA
Studdy to improve the processing line of a mineral process in order to imporve the pwhole product-yield. Marketanalyse for the usage of fine sand (<2 mm, >95% CaCO3)

VA ERZBERG; EISENERZ, AUSTRIA
Support of the operation of a pilot plant for a specific (confidential) physical and termal process.

KIRCHDORFER ZEMENTWERK, KIRCHDORF an der Krems, AUSTRIA
Feasibility studdy to umprove the productivity of a vertical-mill grinding plant.
Continuous openpit mine-planing

MARKOLIN GmbH - Diabas - Open Pit Mine, BRUECKL, AUSTRIA
Permit Procedure for an extention in: (1) the use of natural resources, (2) mine waste, (3) public water usage (river).


2020

KIRCHDORFER ZEMENTWERK, KIRCHDORF an der Krems, AUSTRIA
Support for a permit for: natural ressources in order to continue with the mine operation.
Perchase of mining equimment (hydraulic excavator, front end loader - 50t class each).
Continuous improvement of a 3-stage metall separation plant (maerial k80 < 1mm)

STRABAG
Feasibility study of a dry processing plant to reduce the fines  ( < 63µm fraction) in sand. Considered was an operation with an without the use of availabe hot exhaust gases of a nearby asphalt mixing plant. The studdy included: permit documentation, investiment cost, operation cost.

ALAS GmbH, OHLSDORF, ÖSTERREICH
Project developement, Tender preparation, Support at the allocation proccess for: A ballmill in closed cicuit with a separated pre-drying plant of raw material including the usage of hot waste gases.

 



 

 AUSTRIA

 

2013

AUSTRIAN RESEARCH  INSTITUTION (FFG)

Research in automated evaluation of grinding processes.

PMT- TECHNOLOGIES; AUSTRIA

Support in the developement of separators for alternative fuels.

BURGSTALLER GMBH; AUSTRIA

Commercial evaluation  of the business field "sand and concrete" 

Mining plan of a small coal open pit, including authorisation process.

2012

PRODUKT DEVELOPEMENT  SEKTION SOFTWARE  ZEMENT

pdp stands for "process data processing"; complex calculation using raw data for process evaluation in the cement industry (from burner to clinker cooler).

ALPHA  CALCIT GMBH; AUSTRIA

Konzeptionelle planning and evaluation of project cost for a grinding plant.

W&P; WIETERSDORF; AUSTRIA

Feasibility study for a retrofit of a grinding plant.

Planing of an  ATEX Adaptation for a coal grinding plant  

Evaluation of alternative fuel and raw material usage.

ASPANGER AG; AUSTRIA 

Support during the rationalisation process at the installed  wet processing plant (bottle neck and production cost  analyses)

KIRCHDORFER ZEMENTWERK HOFMAN GMBH; AUSTRIA

Investmentevaluation: Replacement or retrofit of a roller mill (limestone, slag).

Update of raw material reserves (using geostatistica model)  and evaluation of the block model over a 10 years period.  

ZEMENTWERK HATSCHEK GMBH, ÖSTERREICH

Training for engineers using a practical mill audit going from correct sampling to data analyses (reporting improvement actions).  

ROCKTEQ GMBH; BRD

Analyses of a multy channel burner.

2011

AUSTRIAN RESEARCH  INSTITUTION (FFG)

Research  on automated smart data calculation about the clinker production process (Zement).

PT - CONSULTANTS; BRD

Support in preparation of a  tender for a cement plant in  IRAN und MALI

FEINSTOFF GMBH, AUSTRIA

optimisation of a fine grinding plant (15.000 Blaine)

W&P; PEGGAU, AUSTRIA

Support in a roller mill retrofit

2010

BAUMIT ITALIA, SAN VITO AL TAGLIAMENTO, ITALIA

Audit of a limestone grinding plant. Planning of a separator retrofit. 

SCHWARZENBERG STEINBRUCH BETRIEBS GMBH; MURAU; AUSTRIA

Planning of a new open pit and a hard rock processing plant inkluding whole authorisation process.

BERGBAUTAG GASTEIN; AUSTRIA 

Presentation about the usage of alternative raw materials and fuels.

ZEMENTWERK LEUBE GMBH; GARTENAU, AUSTRIA

Audit of a grinding plant.

Analyses of the organisation of the production team (Contents of meeting, flow  and sustainability of information) 

MARKOLIN GMBH; KROBATEN, AUSTRIA

Authorisation process of a new  open pit with a 5- years plan.

W&P; PEGGAU, AUSTRIA

Comparison of different grinding processes on lime.

Cost evaluation and planning of a roller mill for different materials.

2009

SCHWARZENBERG STEINBRUCH BETRIEBS GMBH; MURAU, AUSTRIA. 

Prospektion- and mine planning and feasibility study on a new hard rock plant for building materials.  

W&P; PEGGAU, AUSTRIA

Adaptasion of a grindig plant with Focus on the dynamic separator.

2009 SCHWARZENBERG STEINBRUCH LTD LTD; MURAU, AUSTRIA

Exploration and mine planning of an hardrock open pit mine for building material. planning of a processing plant for aggregates, asphalt and road construction

2009 COMPANY FOUNDATION

Consulting Engineering Jedlitachka; short: cej