MARKOLIN GmbH - Diabas - Open Pit Mine, BRUECKL, AUSTRIA
Preparation of official mineplan 2022-2026.
AUSTRIAN RESEARCH FUNDING INSTITUTE (FFG)
Research about Reduction of process related kiln-stoppage by forward-looking data evaluation.
2021
PMT - Powder Making Technologies; GLEISDORF, AUSTRIA
Preparing a best practice for ballmill cooling by water injection.
DEUTSCHE BARYT INDUSTRIE, BAD LAUTERBERG, BRD
Audit of a fine-grinding Plant (k80 < 7µm). Focus: new product line; Preparation of todo's inkluding an investment estimate to improve the operation.
MODRE BERGBAU GmbH, BERGSTEIN, AUSTRIA
Studdy to improve the processing line of a mineral process in order to imporve the pwhole product-yield. Marketanalyse for the usage of fine sand (<2 mm, >95% CaCO3)
VA ERZBERG; EISENERZ, AUSTRIA
Support of the operation of a pilot plant for a specific (confidential) physical and termal process.
KIRCHDORFER ZEMENTWERK, KIRCHDORF an der Krems, AUSTRIA
Feasibility studdy to umprove the productivity of a vertical-mill grinding plant.
Continuous openpit mine-planing
MARKOLIN GmbH - Diabas - Open Pit Mine, BRUECKL, AUSTRIA
Permit Procedure for an extention in: (1) the use of natural resources, (2) mine waste, (3) public water usage (river).
2020
KIRCHDORFER ZEMENTWERK, KIRCHDORF an der Krems, AUSTRIA
Support for a permit for: natural ressources in order to continue with the mine operation.
Perchase of mining equimment (hydraulic excavator, front end loader - 50t class each).
Continuous improvement of a 3-stage metall separation plant (maerial k80 < 1mm)
STRABAG
Feasibility study of a dry processing plant to reduce the fines ( < 63µm fraction) in sand. Considered was an operation with an without the use of availabe hot exhaust gases of a nearby asphalt mixing plant. The studdy included: permit documentation, investiment cost, operation cost.
ALAS GmbH, OHLSDORF, ÖSTERREICH
Project developement, Tender preparation, Support at the allocation proccess for: A ballmill in closed cicuit with a separated pre-drying plant of raw material including the usage of hot waste gases.
AUSTRIA
2013
AUSTRIAN RESEARCH INSTITUTION (FFG)
Research in automated evaluation of grinding processes.
PMT- TECHNOLOGIES; AUSTRIA
Support in the developement of separators for alternative fuels.
BURGSTALLER GMBH; AUSTRIA
Commercial evaluation of the business field "sand and concrete"
Mining plan of a small coal open pit, including authorisation process.
2012
PRODUKT DEVELOPEMENT SEKTION SOFTWARE ZEMENT
pdp stands for "process data processing"; complex calculation using raw data for process evaluation in the cement industry (from burner to clinker cooler).
ALPHA CALCIT GMBH; AUSTRIA
Konzeptionelle planning and evaluation of project cost for a grinding plant.
W&P; WIETERSDORF; AUSTRIA
Feasibility study for a retrofit of a grinding plant.
Planing of an ATEX Adaptation for a coal grinding plant
Evaluation of alternative fuel and raw material usage.
ASPANGER AG; AUSTRIA
Support during the rationalisation process at the installed wet processing plant (bottle neck and production cost analyses)
KIRCHDORFER ZEMENTWERK HOFMAN GMBH; AUSTRIA
Investmentevaluation: Replacement or retrofit of a roller mill (limestone, slag).
Update of raw material reserves (using geostatistica model) and evaluation of the block model over a 10 years period.
ZEMENTWERK HATSCHEK GMBH, ÖSTERREICH
Training for engineers using a practical mill audit going from correct sampling to data analyses (reporting improvement actions).
ROCKTEQ GMBH; BRD
Analyses of a multy channel burner.
2011
AUSTRIAN RESEARCH INSTITUTION (FFG)
Research on automated smart data calculation about the clinker production process (Zement).
PT - CONSULTANTS; BRD
Support in preparation of a tender for a cement plant in IRAN und MALI
FEINSTOFF GMBH, AUSTRIA
optimisation of a fine grinding plant (15.000 Blaine)
W&P; PEGGAU, AUSTRIA
Support in a roller mill retrofit
2010
BAUMIT ITALIA, SAN VITO AL TAGLIAMENTO, ITALIA
Audit of a limestone grinding plant. Planning of a separator retrofit.
SCHWARZENBERG STEINBRUCH BETRIEBS GMBH; MURAU; AUSTRIA
Planning of a new open pit and a hard rock processing plant inkluding whole authorisation process.
BERGBAUTAG GASTEIN; AUSTRIA
Presentation about the usage of alternative raw materials and fuels.
ZEMENTWERK LEUBE GMBH; GARTENAU, AUSTRIA
Audit of a grinding plant.
Analyses of the organisation of the production team (Contents of meeting, flow and sustainability of information)
MARKOLIN GMBH; KROBATEN, AUSTRIA
Authorisation process of a new open pit with a 5- years plan.
W&P; PEGGAU, AUSTRIA
Comparison of different grinding processes on lime.
Cost evaluation and planning of a roller mill for different materials.
2009
SCHWARZENBERG STEINBRUCH BETRIEBS GMBH; MURAU, AUSTRIA.
Prospektion- and mine planning and feasibility study on a new hard rock plant for building materials.
W&P; PEGGAU, AUSTRIA
Adaptasion of a grindig plant with Focus on the dynamic separator.
2009 SCHWARZENBERG STEINBRUCH LTD LTD; MURAU, AUSTRIA
Exploration and mine planning of an hardrock open pit mine for building material. planning of a processing plant for aggregates, asphalt and road construction
2009 COMPANY FOUNDATION
Consulting Engineering Jedlitachka; short: cej